BA1307J Budget Development Column Copy Process
| Report: |
| |||
|---|---|---|---|---|
| Special Instructions | None | |||
| Frequency | On-request | |||
| Scheduling Restrictions | None | |||
| Execution Time | Batch/On-line (B) | |||
| Job Completion Status | JOBFAIL | |||
| Job Groups | None | |||
| Job Dependency | None | |||
| Operator Instructions | None | |||
| Estimated Run Time | 5 to 20 min. | |||
| Recovery/Restart | This job is restartable. |
Parameters
| Parameter | Values |
|---|---|
| BA1307-COLMN | Column number to copy data to. Requires two digits, for example, 01. |
| BA1307-COMM-OPT |
0 = Do not modify existing comments 1 = Replace existing comments 2 = Delete existing comments |
| BA1307-FND-OPT |
Y = Yes, load only the funds defined on the Budget
Initialization Table by Fund N = No, do not load only the funds defined on the Budget Initialization Table by Fund; load all funds |
| BA1307-LABEL | Column field title (defined in BA1006) of column to copy data to. |
| BA1307-SRC | The column number of the budget development amount column to be copied. Requires two digits, for example, 01. If the receiving column is to be set to zero, then enter 00 for this parameter. |
Distribution:
FMS
Created: WED, JAN 04, 2012, 06:54 AM