SMS Job Scheduling
CMxxxxJ FCxxxxJ ISxxxxJ SDxxxxJ SMxxxxJ SRxxxxJ MGxxxx SGxxxx Other

IS1205J
Update Schedule 25 Room Assignment

Update the class schedule with the room assigned by the Schedule 25 algorithm. Produces a Room Schedule Update report IS1205.
Report:
IS1205    Room Schedule Updates
Special Instructions None
Frequency On-request
Scheduling Restrictions None
Execution Time Anytime (O, B, P or I)
Job Completion Status JOBFAIL
Job Groups None
Job Dependency Schedule 25 must be run to create the input for this process.
Operator Instructions None
Estimated Run Time 1 minutes
Recovery/Restart This job is restartable.


Parameters

IS1201-OPT Record selection from one of the following:
1 = Class Schedule
2 = Class Schedule and History
3 = Construction

Distribution: UNIVAL
Created: WED, JAN 04, 2012, 07:09 AM