FMS Job Scheduling
BAxxxxJ BMxxxxJ FMxxxxJ GAxxxxJ MMxxxxJ PMxxxxJ FGxxxx Other

MM5103J
Infrastructure Listing

This report provides a detailed listing of improvements other than buildings and their attributes.
Report:
MM5103    Improvements Other Than Buildings
Special Instructions None
Frequency On-request
Scheduling Restrictions Job Group Only
Execution Time Batch/On-line (B)
Job Completion Status JOBFAIL
Job Groups
FG040R     FAE Building Reporting
Job Dependency This job requires the extract file from MM5303J
Operator Instructions None
Estimated Run Time None
Recovery/Restart This job is restartable.


Parameters

MM5103-SORT-OPT 01 = Sort by college/building
03 = Sort by college/location/building

Distribution: FMS
Created: WED, JAN 04, 2012, 07:19 AM