MM5121J List of Construction In Progress


Report:
MM5121    List of Construction In Progress
Special Instructions None
Frequency On-request
Scheduling Restrictions Job Group Only
Execution Time Batch/On-line (B)
Job Completion Status JOBFAIL
Job Groups
FG040R     FAE Building Reporting
Job Dependency This job requires the extract file from MM5303J
Operator Instructions None
Estimated Run Time None
Recovery/Restart This job is restartable.

Parameters

Job parameters
ParameterValues
MM5121-SORT-OPT 01 = Sort by college/building
03 = Sort by college/location/building

Distribution: FMS
Created: WED, JAN 04, 2012, 07:19 AM