SR1106J Print MIS Stu Summary SR1106
| Report: |
| |||
|---|---|---|---|---|
| Special Instructions | This job is for SBCCE use only. | |||
| Frequency | On-request | |||
| Scheduling Restrictions | None | |||
| Execution Time | Anytime (O, B, P or I) | |||
| Job Completion Status | JOBFAIL | |||
| Job Groups | None | |||
| Job Dependency | None | |||
| Operator Instructions | None | |||
| Estimated Run Time | 15 minutes | |||
| Recovery/Restart | This job is restartable. |
Parameters
| Parameter | Values |
|---|---|
| SMIS-DB-AYR | Leave blank to use current academic year's data base as input. Otherwise, enter academic year of SMIS data base to be used for input (e.g., for academic year 1990-91, enter 9091). |
| SR1106-FND-OPT |
Enter 'A' or 'B' to indicate if the
students' priority Fund Source Category or
the Fund Source Categories of the students'
classes are to be used in the report
processing. A = Students' priority Fund Source Category B = Fund Source Categories of students' classes. |
| SR1106-FND-SEL | Enter up to 3 Fund Source Categories for which the report is to be produced. Valid values are blank, 1, 2, 3. If more than one is entered, do NOT use spaces or commas to separate the entries. If left blank, all Fund Source Categories will be used. |
| SR1106-RUN-VER | Enter 2 digit run version number to be printed on report. |
| YRQ | Enter the year-quarter to be processed. |
Distribution:
SMS P999
Created: WED, JAN 04, 2012, 07:38 AM