SMS Job Scheduling
CMxxxxJ FCxxxxJ ISxxxxJ SDxxxxJ SMxxxxJ SRxxxxJ MGxxxx SGxxxx Other

SR2203J
Create MIS 2 Audit File

This job creates a copy of the MIS2 file to be transported the central reporting processor.
Special Instructions None
Frequency Quarterly
Scheduling Restrictions Job Group Only
Execution Time Anytime (O, B, P or I)
Job Completion Status GROUPFAIL
Job Groups None
Job Dependency Job SR2211J (MIS2) must be run prior to this job.
Operator Instructions None
Estimated Run Time 10 minutes
Recovery/Restart This job is restartable.


Parameters

MIS-COL Enter ALL, 999 or a valid college for which report is to be produced:
ALL = Produce a college report for all colleges.
999 = Produce a system rollup report only.
nnn = Produce a report for the specified college only (where 'nnn' is a valid college code).

Distribution: SMS CC
Created: WED, JAN 04, 2012, 07:38 AM