SR2201J MIS 2 Report
| Report: |
| |||||||
|---|---|---|---|---|---|---|---|---|
| Special Instructions | None | |||||||
| Frequency | On-request | |||||||
| Scheduling Restrictions | None | |||||||
| Execution Time | Production (P) | |||||||
| Job Completion Status | GROUPFAIL | |||||||
| Job Groups |
| |||||||
| Job Dependency | If the tenth day enrollment count is to be current, this job should be run in a job group. | |||||||
| Operator Instructions | None | |||||||
| Estimated Run Time | 15 minutes | |||||||
| Recovery/Restart | This job is restartable. |
Parameters
| Parameter | Values |
|---|---|
| MIS-COL |
Enter ALL, 999 or a valid college for which report
is to be produced: ALL = Produce a college report for all colleges. 999 = Produce a system rollup report only. nnn = Produce a report for the specified college only (where 'nnn' is a valid college code). |
| SR2201-OPT |
1 = This option will only edit the Class
Schedule for MIS2 reporting requirements.
The MIS2 Summary report will also be pro- duced. 2 = This option will edit the Class Schedule and print the MIS2 report. 3 = This option will edit the Class Schedule file and print the MIS2 report. It will also produce the MIS2 file, SR2201S. This file will not be purged after this pro- cedure is run and may be used for the col- lege's internal information. |
| YRQ | Enter the year-quarter to be processed. |
Distribution:
SMS CC
Created: WED, JAN 04, 2012, 07:38 AM