CR2128J Annual Fixed Asset Report


Job parameters
ParameterValues
Report:
CR2128    Annual Fixed Asset Report
Special Instructions Report option (CR2128-RPT-OPT) must be "B" in FG049R
Frequency On-request
Scheduling Restrictions Job Group Only
Execution Time Batch/On-line (B)
Job Completion Status GROUPFAIL
Job Groups
FG049Q     Final SARS Reporting and Transmittal
FG057R     FAE/SARS Process - Preliminary
FG064Q     Quarterly SARS File Submission
Job Dependency This job requires the extract file from CR2111J (FAE/SARS Interface Extract).
Operator Instructions None
Estimated Run Time 5-15 minutes
Recovery/Restart This job is restartable based upon the following: This job is restartable after groupfail. Requires Analyst assistance to restart after FATAL.

Parameters

Job parameters
ParameterValues
CR2128-RPT-OPT C = Produce Report by College
D = Produce Report by District
B = Produce Both
CR2128-SELECT ccc = College Code (only valid for CR2128-RPT-OPT = C)
ddx = District Code
999 = System Summary

Distribution: FMS
Created: WED, JAN 04, 2012, 06:54 AM