IS1233J Tenth Instructional Day Posting


Report:
IS1233A    Tenth Instructional Day Posting
IS1233B    Tenth Instructional Day Posting Exception Report
Special Instructions None
Frequency On-request
Scheduling Restrictions Job Group Only
Execution Time Anytime (O, B, P or I)
Job Completion Status None
Job Groups
SG147R     Tenth Instructional Day Post
Job Dependency IS1201J Class Schedule Extract
Operator Instructions None
Estimated Run Time None
Recovery/Restart This job is restartable.

Parameters

Job parameters
ParameterValues
IS1201-OPT Record selection from one of the following:
1 = Class Schedule
3 = Construction
IS1233-CAL-CD Instructional calendar code that will be used for calculating the tenth instructional day date from the selected start date.
IS1233-CONT-SEQ C = Only report and/or update Continuing classes.
S = Only report and/or update Sequential classes.
Blank = Report and/or update both Continuing and Sequential classes.
IS1233-PRT-OPT 1 = Print all classes. 2 or Blank = Print only the classes that are to be updated with a new tenth instructional date.
IS1233-SRT-OPT 01 = COURSE-ID, SECT
02 = ITM-NUM
11 = ADMIN-UNIT, COURSE-ID, SECT
13 = ADMIN-UNIT-1, COURSE-ID, SECT
17 = ADMIN-UNIT-1, ITM-NUM
18 = ADMIN-UNIT, ITM-NUM
23 = ADMIN-UNIT-2, ITM-NUM
24 = PRG-INDX, ORG-INDX, ITM-NUM
29 = ITM-NUM, INSTR-NAME
IS1233-STRT-DATE Enter STRT-DATE in MMDDYY format. If entered, record selection will be made on those records whose STRT-DATE is equal to or greater than selected STRT-DATE. If BLANK, all class records will be selected.
IS1233-UPD-OPT Y = Update CLASS-D or CONSTR-D dataset TEN-DAY-CLASS with calculated tenth instructional day date.
N = No update.
YRQ-LINE Enter the YRQ to be processed.

Distribution: SMS
Created: WED, JAN 04, 2012, 07:09 AM