CR7210J W-2 Confirmation Report
| Report: |
| ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Special Instructions | None | ||||||||||
| Frequency | Annually | ||||||||||
| Scheduling Restrictions | None | ||||||||||
| Execution Time | Anytime (O, B, P or I) | ||||||||||
| Job Completion Status | None | ||||||||||
| Job Groups |
| ||||||||||
| Job Dependency | CR7200J must be processed prior to this job. | ||||||||||
| Operator Instructions | None | ||||||||||
| Estimated Run Time | None | ||||||||||
| Recovery/Restart | This job is restartable. |
Parameters
| Parameter | Values |
|---|---|
| ID-PRINT-OPT |
Enter the option for printing the employees
identification number to the report: E = Print the Emp-Id (SSN) L = Print last 4 characters of Emp-Id (SSN) S = Print the System Id (SID) B = Print spaces or blanks * = Print all asterisks |
| W2-ACT-SRT |
W-2 sort sequence for active employees: 1 = Permanent zip, Employee Name, Employee Id. 2 = Home Department, Employee Name, Employee Id. 3 = Payment Distribution Location, Employee Name, Employee Id. 4 = Employee Type, Employee Name, Employee Id. 5 = Employee Name, Employee Id. |
| W2-CONF-SRT |
Sort sequence for W-2 confirmation report: 1 = Employee Status, Employee Name, Employee Id. 2 = Employee Status, Employee Id. 3 = Employee name, Employee Id. 4 = Same sort as W-2 forms. |
| W2-DFR-LBL-1 W2-DFR-LBL-2 |
The plan type ID of deferred compensation
plan being reported. Parameter coding is: D=401K E=403B F=408K G=457 H=501C The letter will appear on the W-2, the IRS section code will appear on the reports. |
| W2-SEP-SRT |
W2 sort sequence for separated employees: 1 = Permanent zip, Employee Name, Employee Id. 2 = Home Department, Employee Name, Employee Id. 3 = Payment Distribution Location, Employee Name, Employee Id. 4 = Employee Type, Employee Name, Employee Id. 5 = Employee Name, Employee Id. |
Distribution:
PPMS
Created: WED, JAN 04, 2012, 07:09 AM