FMS Job Scheduling
BAxxxxJ BMxxxxJ FMxxxxJ GAxxxxJ MMxxxxJ PMxxxxJ FGxxxx Other

MM5305J
FAE Extract File Purge

This job removes the work file created in MM5301J (FAE Generalized Extract).
Special Instructions None
Frequency On-request
Scheduling Restrictions Job Group Only
Execution Time Batch/On-line (B)
Job Completion Status None
Job Groups
FG037R     Equipment Inventory Reporting
FG040R     FAE Building Reporting
FG041R     FAE Room Reporting
FG042R     Land Inventory Reporting
FG047R     FAE Building Operating Budget Reports
FG048R     FAE Land Operating Budget Reports
FG050R     SBCCE FAE Building Operating Budget Reports
FG051R     SBCCE FAE Land Operating Budget Reports
FG059R     SBCCE FAE Building Reports
FG061R     SBCCE FAE Equipment Reports
Job Dependency This job requires the extract file from MM5301J or MM5302J or MM5303J or MM5304J
Operator Instructions None
Estimated Run Time 1 minute
Recovery/Restart This job is restartable.


Parameters

None.

Distribution: FMS
Created: WED, JAN 04, 2012, 07:19 AM